the Palms ( in process) » HPAC Energy Centre
palms

HPAC are currently working with Naylor Love on the Palms Kmart project. Our Commercial Manager Craig Turner is leading the team on site to install our customised HVAC solution.  

The coolest part during the installation was that we used a helicopter instead of a crane to lift the outdoor units into position, providing cost and time savings.  

This is a good embodiment of the difference of HPAC, we are constantly researching and sourcing the latest technology and applying it through design, sales, installation, service and ongoing support.

From heat pumps, ventilation to hot water heat pumps and underfloor heating, we’ve got a solution for every season.

Talk to the experts
Join us on Facebook
© Copyright HPAC Energy Centre 2021